The electrical compliance report, electrical compliance certificate can be executed in all regions in Belgium (Brussels, Flanders, Wallonia).




In what case do I have to do an electrical compliance certificate?
What is the price of an electrical compliance certificate?
What is the validity duration of an electrical compliance certificate?
Do I have to do a control of my electrical installation if my property is rented?
What is the purpose of electrical inspection?


In what case do I have to do an electrical compliance certificate?

If after buying a house or apartment, the electrical installation report list one or more infringements, the new owner has 18 months (starting from the date of sale) to make changes to his electrical installation and ask to create or adapt the necessary change on the location diagram and on the single line diagram. That's when he can apply for a compliance to commit changes to the electrical installation. certibru electrical compliance certificate

The electrical compliance is also required:
- Every 25 years (periodic inspections).
- During the commissioning of a new facility.
- At a significant extension of the installation.
- At a substantial modification of the facility.
- At a temporary facility (on a construction site).
- In case of enhancing the power of the connection.

Some organizations such as the municipality, the fire department (for businesses) or the “Fonds du logement” may ask you to produce electrical compliance report.

VERY IMPORTANT: It is mandatory that during the appointment for electrical compliance certificate you have in your possession and in triplicate, the location diagram with its corresponding single line diagram. Click here to see an example of a single line diagram and a location diagram.

CAUTION: If you are in the context of the selling an apartment or a house you will need an electrical installation report. This type of control is less restrictive.


What is the price of an electrical compliance certificate?

The price for an electrical compliance report is 150 euros VAT included.

This rate is valid by electric meter, for all types of house or apartment in all regions in Belgium (a day/night meter equals one meter).

If you have a much more complex electric system, such as: more than one electric meter, a restaurant, a warehouse, a shop, please contact us for a price quote.


What is the validity duration of an electrical compliance report?

The electrical compliance report with positive conclusion is valid for 25 years, on condition that no modification or extension is made to the electrical installation.

The electrical compliance report with positive conclusion is valid for 5 years in case it is for a place welcoming public such as shops, businesses, offices, tourist rentals (direct hire, Airbnb ...), nurseries, bars, restaurants, snacks, food trucks...


Do I have to do a control of my electrical installation if my property is rented?

The General Regulation on Electrical Installations (Règlement général sur les installations électriques) does not require to perform an electrical check within the context of a lease.
But it is mandatory to carry an inspection of the electrical system every 25 years.
In addition, the owner would normally guaranty the quality of the electrical installation to enable the tenant to occupy the property safely. Insurance may request after a disaster, a proof that the electrical system was in order.

In summary, even if the regulations do not require the owner to produce an electrical compliance report within the context of a lease, the owner should have one made at least once every 25 years. This document allows him at the same time to avoid liability in case of disaster.


What is the purpose of electrical inspection?

The evaluation of the domestic electrical installation is designed to ensure the safety of persons and property conservation. The electrical inspection is performed based on the RGIE: General Regulation on Electrical Installations (Règlement général sur les installations électriques).



Contact

by mail:
CertiBru
Sylvain Thouvenel
Rue Gabrielle Petit 47
1080 Brussels, Belgium

Our old address: Chaussée de Waterloo 671 at 1050 Brussels

by telephone:
0486 68 56 77
Monday to Friday from 9am until 7pm (nonstop)

from outside of Belgium dial +32 486 68 56 77

by email:
email certibru
Or on our contact page: Contact us

News and promotion :
certibru blog certibru facebook certibru google certibru twitter
Brussels Environment Accreditation

ID Number: 0468992
Individual: THOUVENEL Sylvain

EPB Residential
Accreditation Number: CREPP-001026326
Date of Accreditation: 22 May 2011

EPB Tertiary
Accreditation Number: CTEPP-001181893
Date of Accreditation: 3 December 2012

EPB Public Building
Accreditation Number: CPUPP-001190481
Date of Accreditation: 25 February 2013


Banque Carrefour des Entreprises

Company number: 0835.932.142
Terms and Conditions

our terms and conditions
our terms and conditions


Useful Links

Moniteur Belge about EPB Certificate
In French: www.ejustice.just.fgov.be
In Dutch: www.ejustice.just.fgov.be

Brussels Environment / IBGE - BIM
Qu'est-ce que le certificat PEB?:
www.bruxellesenvironnement.be/certificatpeb
Wat is het EPB certificaat?:
www.leefmilieubrussel.be/epbcertificaat

Brussels Capital Region Portal
www.brussels.irisnet.be


CertiBru QR Code

QR code certibru